After surface coating the modules are
bolted together with torque wrenches |
|
All components mounting plates,
electrical components are mounted,
wired, connected for power and control
wiring. |
|
The copper wiring used is ISI marked,
lugs ferrule are provided for best
electrical connections. |
|
Wherever required the terminal blocks
are provided for termination of cables. |
|
The loops of loose wire in control
wiring are left for use in future and
maintenances. All lugs in control wiring
are covered with sleeves. The bunch of
wires are tied with binding straps and
fixed with p-clips. After assembling of
components all panels are tested for
Operational test, Merger test, H.V.
Test. |